Hey everyone, it’s Sam from the 63A distribution box team—today I’m diving into something I get asked about ALL the time, especially when you’re upgrading a workshop, reconfiguring your shop floor, or even just fitting out a cool new studio space: how to extend cable entries on a 63A distribution box. 63A Distribution Box

First off, let’s cut the crap—this isn’t some super secret, only-electricians-know trick. I’ve seen too many people hack this wrong, and trust me, that’s a recipe for blown circuits, loose wires, or worse. I’ve been supplying 63A DBs (that’s distribution boxes, for the new folks) for years, and I’ve heard every mistake under the sun: stripping too much insulation, forcing cables through wrong, skipping the grommets. Let’s fix that today, no fancy jargon, just real, actionable stuff I’ve tested on hundreds of job sites.
First, why would you even need to extend cable entries? Original DBs usually come with a few pre-punched knockouts, right? But if you’re running a whole new set of circuits—say, a welders, a commercial fridge setup, or extra lighting zones—your standard knockouts might not line up, or you might need to run thicker cables (like 10mm² or 16mm² for 63A, not the wimpy 2.5mm² for lights) that won’t fit through the standard holes. Extending the entry doesn’t mean “making the hole bigger” willy-nilly—it means adapting it to whatever cable you’re using, keeping the DB safe and compliant.
Wait, quick note: 63A DBs are built for heavy-duty use, so whatever you do with the cable entries has to meet IEC or local wiring regs (more on that later) to keep your setup up to code. I can’t tell you how many times a customer has come back saying their local inspector flagged their “creative” entry job. That’s a headache, so we’re keeping it safe and correct.
First, let’s gather the stuff you’ll actually need. No random parts from the garage. Let’s list them clearly:
- Your 63A distribution box (duh, but make sure it’s ours? Wait no, just any solid, well-made one—cheap thin-metal DBs bend easy, which messes with the entries. Pro tip: get a DB with a thick outer shell, that’s what we supply, for this exact reason.)
- The right cable glands—NOT the ones for tiny 2.5mm² wires. For 63A, you need either metric M20, M25, or M32 glands, depending on your cable size. These are the metal or plastic bits that seal the cable to the DB, stop dust/water (if it’s an outdoor DB), and hold the wire tight so it doesn’t pull free.
- Knockout tools (a screwdriver and a mallet work in a pinch, but a proper knockout punch is way cleaner—no sharp edges left)
- Grommets, if you’re using multiple smaller cables through the same extended hole (think: if you have 3 thin wires going in together, a grommet will stop them from fraying on the metal edges of the DB)
- Tape measure, marker, and wire strippers (obvi, but make sure your strippers match your cable size)
- A little bit of silicone sealant, if the entry is outdoors (to keep water out—we supply weather-resistant glands too, fyi)
Now, step by step. Let’s start with prepping your DB, because rushing here is where mistakes happen. First, TURN OFF THE MAIN SUPPLY. This is non-negotiable, no exceptions. Even if you think the power’s off, double check with a voltage tester. I’ve seen someone almost get a shock because they skipped this—don’t be that guy.
Next, find the spot where you want your extended entry. Don’t just pick a random side! Look at where your cables are running to: if they’re coming from the floor, pick the bottom of the DB (water runs down, so bottom entries prevent pooling). If they’re coming from the wall, pick the side. For 63A DBs, the back is usually reserved for bus bars, so don’t punch a hole there—trust me, I’ve seen a guy punch through the bus bar cover and fry his whole setup. We mark on our DBs where the safe knockout zones are, that’s a little pro tip from our team.
Once you’ve picked the spot, mark the hole. If you’re using a single thick cable (like 16mm² for a 63A circuit), match the size of your gland to the cable. For example, a 16mm² cable fits perfectly in an M25 gland. If you’re using multiple smaller cables through one extended entry, you can use a larger knockout and a multi-cable gland, or a grommet to separate them. Important: never make the hole bigger than it needs to be—too much empty space inside the DB can let dust, pests, or even fire spread between wires.
Now, punch the knockout. If you’ve got a proper knockout punch, line it up with your mark, tap gently with a mallet until it cuts through, then pop the metal slug out. If you’re using a screwdriver and mallet, angle the screwdriver so you don’t bend the metal inward—bent sharp edges on DBs are a nightmare, they’ll fray your cables. Once the knockout is out, deburr the edges (use a file or even the back of your screwdriver) so there’s no sharp metal left to nick your cable insulation. That’s a small step that saves so much hassle.
Now, here’s the actual “extending” part people mess up: installing the cable gland. Wait, when we say extend the entry, we’re not just making a hole—we’re creating a sealed, strain-relieved entry. That’s the key. Thread the gland nut through the hole from the outside of the DB. Most glands have a lock washer or a rubber seal that goes on the inside of the DB, right? Tighten the nut from the outside so it’s secure, but don’t over-tighten—you’ll crack the plastic gland, or bend the DB flange. If you’re using metal glands, same thing, just make sure the lock washer is there to stop vibration from loosening it later (super important for industrial setups, where machines vibrate all day).
Now, prepare your cable. Strip the outer insulation 10-15mm from the end—just enough to get the bare wires in the terminal block, not too much that the bare copper sticks out. Wait, but don’t strip the outer insulation where it goes into the gland! That’s what the gland clamps on to, to keep the cable from pulling free. Feed the cable through the gland, all the way through into the DB. Now, tighten the gland’s internal compression nut—this is the part that squeezes down on the outer cable insulation, not the wires. Tighten it just enough that you can’t pull the cable with a little tug, but not so hard that you crush the insulation. That’s strain relief 101, and it’s mandatory for 63A circuits because those wires carry enough current to get hot if they’re loose or pulled.
If you’re using multiple small cables for one extended entry: get a split grommet, or a multi-port gland that has separate holes for each wire. Feed each cable through its own spot in the grommet, push the whole thing into your new knockout hole, then seal the grommet’s edge with a little silicone if it’s outdoors to keep water out. Don’t cram too many wires in one spot—check the DB’s manual, but as a rule, leave 5mm of space between each cable so air can circulate, which keeps the DB from overheating.
Wait, what if I need to extend the entry further out, not just a hole in the side? Oh, right—sometimes your cable is coming from a tight spot, like a wall that’s super close to the DB, so a standard gland isn’t long enough. That’s where cable entry adapters come in, and I should mention this because I get that question a lot. Don’t use random PVC pipe for this—get a metal extension gland that’s rated for the same IP rating as your DB. For example, if your DB is IP65 (weatherproof for outdoor use), get an IP65 extension, not a cheap plastic one. Thread that adapter onto the original hole’s gland, then run your cable through the extension. That way, you’re not violating any wiring regs, and you’ve got the extra length you need. I’ve seen guys use a random piece of conduit here, and when it rained, water pooled in the conduit and seeped into the DB—total disaster. Use rated parts, always.
Now, the final check, which I do on every job I help with: run a tug test on every cable. Grab each wire firmly, give it a good pull—if it moves at all, your gland isn’t tight enough. Next, check the DB’s interior: make sure none of the bare wires are touching the metal shell of the DB, or crossing over other circuits. Bare wires touching the DB = short circuit, which trips your breaker or starts a fire. Also, double check that all the insulation is intact, no nicks from the knockout edges.
Wait, what about if you’re a total beginner? Don’t guess. If you’re not comfortable stripping wires or working with 63A circuits, call a licensed electrician. I’ve had customers try to do this themselves and end up with a tripped main breaker that fried their whole shop’s lights. 63A is not something to mess around with, but if you’re comfortable with basic electrical work, this is totally doable.
Also, a quick note about our 63A DBs specifically—most of them come with pre-marked knockout zones that are perfect for extending entries, because we design them to work with standard glands and knockouts. We don’t cut corners on the metal thickness, so punching holes doesn’t bend the shell, which keeps the DB’s integrity intact. That’s why our customers keep coming back, by the way.
Now, let’s cover the mistakes I’ve seen way too many times, so you don’t make ’em:
- Forcing a cable through a hole that’s too small. That crushes the insulation, which leads to shorts. Measure your cable first, pick the right gland.
- Over-tightening the gland. Cranking it down until the plastic cracks, or the metal DB bends. That ruins the seal, defeats the purpose of extending the entry.
- Skipping deburring. Sharp edges on knockouts nick cables, and over time that leads to a break or a short.
- Using unrated extension parts. PVC pipe, random conduit, whatever—use parts that are made for electrical DBs, not plumbing.
- Forgetting strain relief. If your cable pulls free from the gland, it can arc in the DB, which is a huge fire hazard.
Alright, so that’s the step-by-step. Let’s recap it quick to make sure it’s clear:
- Turn off power, test for no voltage.
- Pick a safe knockout zone on your DB (avoid back bus bar area).
- Mark, punch, deburr the hole.
- Install the appropriate cable gland (or extension adapter if you need extra length).
- Feed cable through, strip insulation (only the end for terminals), tighten gland for strain relief.
- Tug test, check for bare wires touching metal, seal if outdoor.
If you have questions about what parts work with our 63A distribution boxes, or need help sizing glands for your specific cable, hit us up. We don’t do salesy hard sells—we answer real questions, because we’ve been in this game long enough to know that a happy customer is one who has a safe, working DB. Just reach out for a procurement chat, no hoops to jump through.

Wait, one last little tip: label each cable once it’s installed, so you know which circuit is which when you need to do maintenance. That’s way easier than tracing wires in a dark DB later.
Mobile Distribution Box References:
- IEC 60439-1: Low-voltage switchgear and controlgear assemblies. Part 1: General rules.
- National Electrical Code (NEC) Article 312: Wiring Methods and Materials for Enclosures.
- CSA C22.1: Canadian Electrical Code, Part I.
Apeks Electric Co., Ltd.
As one of the leading 63a distribution box manufacturers and suppliers in China, we also support custom service. With abundant experience, we warmly welcome you to wholesale high quality 63a distribution box from our factory. Welcome to view our website for more information.
Address: No.2 Yuyao Rd, Yuxin, Nanhu District, Jiaxing, China
E-mail: kevin@apekselectric.com
WebSite: https://www.powerdistros.com/